To participate in tenders for the supply of pallets (pallets), Applicants with sufficient qualifications to make the delivery are invited. The applicant must pass the qualification of the supplier.
To participate in tenders for the supply of MKP (big bags), Bidders with sufficient qualifications to make the delivery are invited. The applicant must pass the qualification of the supplier.
№ |
date of start accepting offers |
Date of receipt of proposals |
Proposal Extension Date |
Tender subject |
Applications |
Status |
---|---|---|---|---|---|---|
Т035 | 20.09.2019 | 04.10.2019 | Synthetic gear oil based on polyglycols SHELL OMALA S4 WE320 DIN 51502/51517 | Technical task | Open | |
Т034 | 28.08.2019 | 12.09.2019 | Stainless Steel Bellows Seal Shutoff Valves | Technical task | Completed | |
Т033 |
05.08.2019 |
16.08.2019 |
|
D-Link DGS-3630-28TC Switch - 2 pcs. D-Link DGS-3630-28SC Switch - 2 pcs. D-Link DPS-500A redundant power supply - 4 pcs. D-Link DEM-CB100S cable - 4 pcs. |
Completed |
|
T032 |
16.07.2019 |
30.07.2019 |
|
Dosimat Plus 876 dosing device, 50 ml removable burette (Exchange Unit), 50 ml replacement burette preventative maintenance kit |
Completed |
|
T031 |
08.07.2019 |
24.07.2019 |
|
Rubber cord flooring for railroad crossing |
Completed |
|
T030 |
02.07.2019 |
15.07.2019 |
|
Cylindrical coaxial gear motor ZKF169-K2- (1LE1502-2DB03-4GB4-Z) |
Completed |
|
T029 |
01.07.2019 |
21.07.2019 |
|
Analytical balance Sartorius Cubis "MSE224S-1CE-DU |
Completed |
|
T028 |
22.07.2019 |
05.08.2019 |
|
A tender for the selection of an agent for the provision of services for the search for contracting organizations for the dismantling of an unfinished building, non-residential, built up to 62%, letter E |
|
Completed |
T027 |
19.06.2019 |
26.06.2019 |
|
Pump model BA42-716J4XM-1012U1V-B manufactured by Teikoku, including TRG meter and 1 PTC thermistor |
Completed |
|
Т017 |
26.02.2019 |
07.06.2019 |
|
Design and construction work on installation of the V-400 m3 averaging tank |
Completed |
|
Т026 |
14.06.2019 |
21.06.2019 |
|
Examination of industrial safety of buildings / structures at a hazardous production facility Installation site for production of polyethylene terephthalate (PET) I hazard class |
Completed |
|
Т025 |
11.06.2019 |
30.06.2019 |
|
Electric forklift with a loading capacity of 2.5 t. - 2 pcs. |
Completed |
|
Т024 |
05.06.2019 |
10.06.2019 |
|
Tender for installation of instrumentation and automation equipment 1. Housing 102 - Installation of instrumentation maintenance platform |
Completed |
|
Т019 |
05.06.2019 |
10.06.2019 |
|
General construction tender 1. Housing 105.2 - Construction and installation work for the installation of a vacuum pyrolysis system 2. Case 105.2 - floor repair |
Completed |
|
Т020 |
05.06.2019 |
10.06.2019 |
|
Facade work tender 1. Case 107 - Repair of the base and blind area 2. Housing 119 - Repair of the base and blind area 3.Case 104 - facade repair 4. Housing 412 (oil pump) - facade repair |
|
Completed |
Т021 |
05.06.2019 |
10.06.2019 |
|
Roofing tender 1. Building 407 (Fire Station), Building 106, Building 103.2 - Roof repair |
|
Completed |
Т022 |
05.06.2019 |
10.06.2019 |
|
Paint and anticorrosion tender
1. Housing 410 (Boiler room) - Paintwork of the metal structures for attaching the roof over the condensate collection tanks
2. Housing 410 (Boiler room) - Corrosion-resistant coating of the chimney frame of boilers №1.2.3 |
Completed |
|
Т023 |
27.05.2019 |
14.06.2019 |
|
Design of flanges, service stations, drain ladders, drinking fountains and a collection tank of industrial water in the production building 101. |
Completed |
|
Т018 |
01.03.2019 |
15.03.2019 |
|
PAG-18 GOST 25912.0-91 |
Completed |
|
Т016 |
26.02.2019 |
11.03.2019 |
|
Provision of security services at the facility of Ekopet Joint Stock Company |
Completed |
|
Т015 |
20.02.2019 |
18.03.2019 |
|
Explosion-proof single-disc brake KENDRION 76 16G-24B00 - 1 pc. |
Completed |
|
Т013 |
05.02.2019 |
19.02.2019 |
|
Hydrogen generator for laboratory measurements by gas chromatography |
Completed |
|
Т012 |
02.11.2018 |
09.11.2018 |
|
1,1,2,2-tetrachloroethane- ≥98% |
Completed |
|
Т011 |
14.06.2018 |
25.06.2018 |
|
Technical re-equipment of the boiler room, conversion of steam boilers to natural gas |
Completed |
|
Т010 |
13.06.2018 |
29.06.2018 |
|
PVS automatic viscosity measuring system with VRM flushing modules |
Completed |
|
Т009 |
01.03.2018 |
12.03.2018 |
|
Pallets (pallets) wooden single-walled double-entry 1050 * 1050 |
|
Completed |
Т008 |
03.09.2017 |
02.10.2017 |
|
Filtered nets for polymer melt |
Appendix №1 Technical task |
Completed |
Т007 |
03.07.2017 |
17.07.2017 |
|
Repair of retaining wall cor. 105.1 |
|
Completed |
Т006 |
22.06.2017 |
29.06.2017 |
|
Corrugated cardboard T-22 "B", brown GOST 7376-89 |
|
Completed |
Т005 |
09.06.2017 |
19.06.2017 |
|
Granite crushed stone fr 0-45 mm |
|
Completed |
Т004 |
09.06.2017 |
19.06.2017 |
|
Geotextiles "Dornit" 250 g / m2 |
|
Completed |
Т003 |
09.06.2017 |
19.06.2017 |
|
Plate PAG-20 GOST 25912.0 |
|
Completed |
Т002 |
07.06.2017 |
16.06.2017 |
|
Battery 12V 100A * h |
|
Completed |
Т001 |
03.05.2017 |
17.05.2017 |
|
Wooden sleepers impregnated for railways type I according to GOST 8816-2003 or GOST 78-2004 |
|
Completed |